MATERIAL MODIFICATION

Material Modification is a process of modifying site won soils and materials to achieve specifications for fill and capping. With rising tipping tax, lack of tips and cost of Aggregates, Modification of site won soils and materials provides the ideal solution.

Through understanding of materials specifications, upfront testing, site testing and validation, it's possible to produce the aggregate requirements on site. Modification differs from stabilisation, as it's a process of producing highways spec fill and capping from what's on site.

We provide the testing, grading, engineering, processing and validation. This saves materials going to landfill, saves aggregate import, reduces the carbon footprint, makes for a safer, cleaner site with massively reduced traffic movements and massively reduces costs.

Need help with your project? call us or use the contact form

Call Us +44 7875 299669

Please click the images below for larger versions

Make an enquiry

For security purposes, please enter the characters from the box above: